How Long Does It Take to Build a House? A Basic Guide

0
1198
Build a House

Have you ever asked the question, “how long does it take to build a house?” If so, you’ve come to the right place. With so many moving parts, the home building process can take a while, but it is possible to estimate how long it will take — and even shorten the process.

Keep reading for a basic guide on how long it takes to build a house!

Getting Started

The initial steps in the home building process include breaking ground and laying a foundation, and these are pretty standard. But some processes, like plumbing and electrical wiring, hinge on the availability of certified technicians.

That’s why it’s important to talk with a contractor before breaking ground. You want to ensure that they have the right people lined up for each step in the process, whether they’re installing insulation or new flooring. When you have a plan in hand, you’ll be able to meet preliminary deadlines more easily.

What Extends the Timeline?

Several factors can make building a home take longer. Weather can pose a problem to the building process, especially if it hurts outdoor working conditions or prevents materials, like concrete, from drying completely. And delays with things like plumbing and ductwork can press pause on other parts of the process.

Additionally, if you’re building a custom home with lots of specifications, that can extend the timeline. But planning carefully when you build a new home can offset the delays. 

It is Possible to Condense the Timeline

While many factors can cause the timeline to grow, it is possible to maintain a shorter timeframe. Planning is key. If you know exactly what type of flooring, paint color, and fixtures you want, you’ll reduce the likelihood of delays.

One process or material can affect another one, so having your ducks in row will help the process move smoothly. Check in with your contractor frequently, too, to ensure that your wishes are being met. Otherwise, you may discover that the home doesn’t come together as you envisioned it.

How Long Does It Take to Build a House? It Depends

On average, it takes just under 8 months to build a new home. This number tends to skew higher for custom builds given the specificity of materials, but that’s not always the case.

With so many external factors coming into play, it’s hard to set a firm timeline when building a home. But if you choose more standard features and remain flexible, you should be able to hit the average.

Plan During the Building Process

Are you still wondering, “How long does it take to build a house?” While the answer is not clearcut, you can expect that a new home will be ready in under a year. Working conditions, availability of supplies, and other factors can affect the outcome, but with some careful planning, you can have a new home soon.

To find the latest info on anything from real estate to business, check back for more helpful articles!